Welcome!

This informative blog allows plastics professionals to discuss plastics training and technology. Brought to you by Routsis Training: the plastic industry's premiere training provider.

Restarting After A Few Years…

I recently received this question…

NK
It has been about 5 years since we trained, what is the best method to restart.

My Response
After a few years, the best way to restart a training initiative is to consider it as though you had not done any training, or a fresh start. This recommendation is because the previous training initiative has fallen through the cracks and some time has passed… your employees are almost always in the need of either retraining or a refresher.
Additional Thoughts
There is always an excuse to not train your employees, but it is never bad time to start training, or to restart a training initiative.
-Andy

Alternate Sources of Fiber Contamination…

A blog reader emailed me some pictures regarding a product which is encountering post-molded contamination of various fibers. After some question and answer, it appears they are using a cleanroom environment and the fiber contamination is from many sources. Most of the typical precautions have been investigated and they are looking for a different opinion on the situation.

My Recommendation
From your notes, it appears you are using a blower fan on the product, if this is not an anti-static fan, we recommend upgrading to an ionizer-style anti-static fan.
On all the blower fans in the molding room, we strongly recommend that the air that is blown over the molded part be diffused or diverted afterwards. This ensures they are not sending the blown-off debris into the room’s atmosphere, or creating small air currents within the room which can pick up other debris and fibers. In one case, I have witnessed a current which actually blew up the wall and across the ceiling because many fans were aimed at the floor in the same direction.
We recommend eliminating any air nozzles on the production floor. These are often used by the employees to clean off machinery, equipment, and clothes. A vacuum with a clean filter should be used for all cleaning unless absolutely necessary.
Additionally, check all the filters in the molding area for both cleanliness as well as for fit.
-Andy

Don’t Overlook the Basics…

I recently encountered a customer with a common concern…

Customer
Should I start all my production employees through the basic level of training?

My Response
Any company, such as this one, which lacks any structured training program, will benefit highly from a broad-based training initiative. Such an initiative should start from the top down, and begins with the basics. This creates a common knowledge and terminology as well as establish a baseline of knowledge from which everyone starts.
Additional Thoughts
Don’t assume that your employees already know everything just because they don’t speak up and say so. It is a rare, and extremely valuable, employee who will let you know if they lack knowledge and need instruction in a specific area.
-Andy 

Evaluating Check Ring Performance…

This question addresses a common issue for many techs…

Jane
What is the best way to evaluate the performance of a check ring?
My Response
To evaluate the performance of the check ring, it is recommended that you perform the dynamic check ring repeatability test. This test consists of producing and weighing a series of ten short shots. The variation of the weights is then determined and represented as a percentage.
Additional Thoughts
Although a shot to shot variation above 3% is typically considered unacceptable, you should consider performing this test on some different processes which are functioning properly to determine a baseline of comparison for your machines and materials.
-Andy

Shut-Off Nozzles and Long Hold Times…

I reviewed the previous post where the blog reader asked whether electric machines are good for applications with long hold times and I wanted to add another comment…

Shut-Off Nozzles
Although some molders purchase shut-off nozzles to eliminate drooling, they are very helpful as part of an overall molding strategy. In the case of a process with a long hold time, a shut-off nozzle can be very helpful in reducing electricity consumption, improving melt capacity, and limiting strain on the hydraulic components or servo-motors.
Hold Time Strategy
In processes where the hold time is long, the shut-off nozzle can often be incorporated as an early hold time cut-off. Once the shut-off nozzle is activated, the material cannot flow back through the nozzle. In most applications with a long hold time, there is a point where a shut-off nozzle will hold the polymer in the mold cavity, allowing hold time to stop, eliminating as much as 30% of the hold time.
When implementing such a strategy, it is best to first determine the optimal hold time with a gate seal study. Once the optimal gate seal time is determined, begin a similar study, using the hut off nozzle in conjunction with a decrease in hold time. When using a cold runner system, you may need to reduce the sprue and runner thickness to help prevent back flow into the runner system. The overall reduction in hold time saves electricity, reduces long-term wear on the machine components, and allows the screw to start recovering early.
-Andy